EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
wcooper
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (176)
Air Conditioning
- (10)
Avionics
- (14)
Brake System
- (3)
Cabin Cover
- (7)
Doors
- (22)
Electrical
- (8)
Empennage
- (16)
-
Elevator Attach
-
Elevator Re-work
-
Elevator Re-work
-
Tailcone Attach
-
Horizontal Stab Attach
-
Horizontal Stab Attach
-
Elevator Attachment
-
Back to work!
-
Pushrod Assembly
-
Tail Cone - Section...
-
Tail Cone - Section 10
-
Elevators - Section 9
-
Horizontal Stab -...
-
Rudder - Section 7
-
Vertical Stab -...
-
Kit Arrives
Engine
Engine Cowl
- (1)
Fiberglass
- (1)
Firewall
Flight Controls
- (13)
Fuel System
- (4)
Fuselage
- (32)
Hangar
- (5)
Inspection
- (2)
Interior Finish
- (9)
Landing Gear
- (2)
Lighting
Paint
- (2)
Propeller
- (1)
Registration
- (1)
Research
- (3)
Training
- (8)
Tools
- (4)
Wings
- (3)
Workshop
- (2)
LCP
- (1)
Builder Name:
William Cooper
-
Project:
Vans - RV-10
-
VIEW REPORTS
Total Hours:
29.5
Total Flight Time:
Total Expense:
$175687.69
Start/Last Date:
Jan 29, 2019 - No Finish Date
Engine:
Lycoming YIO-540-D4A5 RT(Y)
Propeller:
Hartzell C2YR-1BFP/F8068D
Panel:
Garmin
Friendly URL:
https://eaabuilderslog.org?s=wcooper
Home or Last Project Picture
Apr 23, 2020
Back to work!
Category: Empennage
Back to work! Got my wife, Tomoko, to help drive some rivets that were in an awkward spot to drive and buck by myself. Got the Aft Deck riveted in place. I'm ready to start the Empennage Attach now.
IMG_1751.jpg
IMG_1081 copy.jpg
IMG_3680 copy.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.